Decisions, Decisions – Vapor Barrier for a Post Frame Steel Reroof

Decisions, Decisions – Vapor Barrier for a Post Frame Steel Reroof

There are few reasons to replace an existing post frame building’s steel roof, as properly installed it should last a lifetime. Among these reasons could be:

Tired of Existing Color
Old roofing was nailed on
Tree fell through roof

This last one actually occurred to our shouse (shop/house) when I lived in Northeast Washington!

Loyal reader and Hansen Pole Buildings’ client MIKE in COUPEVILLE writes:

Reflective Insulation“I am currently re-siding/re-roofing an existing pole building in order to match the exterior of the building I recently purchased from you.  This building is roughly 32 x34 and the roof purlins are 2×6 on end roughly every 2 feet.  I’m using Fabral’s grand rib 3 29ga for the roof and it will have fully vented soffit overhangs and a vented ridge cap.  I am trying to figure out what I’m going to do for at least a vapor barrier under the roof steel, I see you seem to recommend foil faced bubble insulation but that is not very common in my area.  I am seeing a lot of people using lamtec wmp-vrr (fiberglass insulation with a poly backing)  3″ thick and I believe they lay these wide rolls on top of the purlins and then place the metal roofing on top of that then screw down the roofing compressing the fiberglass insulation between the metal roofing and the purlins.  Have you seen this style of insulating before?  Do you think it is an acceptable way of doing it?  I see as killing two birds with one stone.  I may be insulating this shop in the future so if I do then the roof is already insulated plus I believe it acts as a vapor barrier which is the main reason to do it as I don’t want any condensation dripping down on the inside of the shop.  I live in the Seattle area if that helps to know what my climate is like.  Thanks in advance for your input.” 


Mike the Pole Barn Guru responds:

Our recommendation would be to order your roof steel with factory applied I.C.C. (https://www.hansenpolebuildings.com/2020/09/integral-condensation-control-2/).

Metal Building Insulation (fiberglass with a vinyl facing) is a decent condensation control, provided all of the seams are tightly sealed. It is a pain to work with, provides very little effective insulation value and makes your roofing pucker outwards between purlins https://www.hansenpolebuildings.com/2011/11/metal-building-insulation-in-pole-buildings-part-i/.

If it is too late for an I.C.C. then the radiant reflective barrier (https://www.hansenpolebuildings.com/2017/05/effective-reflective-insulation/)

 is probably your best option.  Order in six foot width rolls to minimize seams and make sure to get a product including a tab along one edge with an adhesive pull strip attached.

2 thoughts on “Decisions, Decisions – Vapor Barrier for a Post Frame Steel Reroof

  1. I have an installation question on this radiant vapor barrier insulation. I’m using solar eclipse- aluminum sandwiched fiber white backing.

    I have had people say to make sure it’s tight over the purlins so it touching the steel prevents condensation.
    And other info telling me to let it sag between purlins for the radiant effectiveness. So if there is a 1inch airgap? will it drip? if it drips I have little pools between purlins.

    Which is the proper way?

    Thanks,
    Jonas

    Reply
    1. admin Post author

      Either way works provided all of the seams are adequately sealed. Personally (if you are not going to use what I recommend – an Integral Condensation Control like Dripstop or Condenstop) I prefer it tight as it is easier to seal laps and looks better when finished.