Do You Do Longer Ones?
Reader DANA in DEER LODGE writes:
“Hello. We are looking at having a 4 door garage built but 2 of the spots will be turned into living space. I see the one you have with 3 garage doors. so you do longer ones? What would the price be to do that and who can we have build it? We close on our property the end of April. How long does it take to get it if we order soon? Thank you.”
Good news – our buildings are 100% customizable for all dimensions and features.
Hansen Pole Buildings is America’s leader in providing fully engineered, 100% custom designed, post frame building and barndominium kits, with dozens provided to our clients across Montana.
Your new building kit is designed for an average physically capable person, who can and will read and follow instructions, to successfully construct their own beautiful building shell, without extensive prior construction knowledge (and most of our clients do DIY – saving tens of thousands of dollars). We’ve had clients ranging from septuagenarians to fathers bonding with their teenage daughters erect their own buildings, so chances are – you can as well!
Your new building investment includes full multi-page 24” x 36” structural blueprints detailing location and attachment of every piece (as well as suitable for obtaining Building Permits), our industry’s best, fully illustrated, step-by-step construction manual, and unlimited technical support from people who have actually built post frame buildings. Even better – it includes our industry leading Limited Lifetime Structural warranty!
Currently (and for the foreseeable future) there is a nationwide shortage of building erectors. Many high quality building contractors are booked out into 2023. We would strongly encourage you to consider erecting your own building shell.
For those without time or inclination, we have an extensive independent Builder Network covering the contiguous 48 states (https://www.hansenpolebuildings.com/find-a-builder/). We can assist you in getting erection labor pricing as well as introducing you to potential builders.
A CAUTION in regards to ANY erector: If an erector tells you they can begin quickly it is generally either a big red flag, or there is a chance you are being price gouged. ALWAYS THOROUGHLY VET ANY CONTRACTOR https://www.hansenpolebuildings.com/2018/04/vetting-building-contractor/
Pre-COVID we could deliver most any building, anywhere in two to three weeks. Due to random supply chain challenges, we do ask our clients to allow 8 to 12 weeks. In many instances, framing materials can be delivered quicker and non-stock special order items such as windows and doors sometimes taking longer.