Tag Archives: building contract

Another Case for DIY Post Frame

Another Case for DIY Post Frame

Reader BRIAN in CINCINNATI writes:

“A construction company is putting the shell of my building up 60x80x16. Just finished steel siding and roof. A number of the 6×6 poles are visually not plumb. My garage doors were being installed today when he called me with concerns of the building being off and not square. He has over an inch gap already only 8 ft up on doors of a 14 foot door. I did call the post frame company and will be sending someone out as well as a crew for attempt to fix. What would you do and can this be fixed without removing all steel liner sheets?”

Mike the Pole Barn Guru says:

Most of our clients build DIY (Do It Yourself) and simply do not have issues such as these.

Why?

Because it is theirs, they care. They will actually read and follow instructions.

Hiring a contractor? Your work starts before you sign a contract.

  • ASSUME YOUR PROJECT WILL END IN COURT
  • ASSUME YOUR CONTRACTOR IS UNTRUTHFUL
  • ASSUME YOUR PROJECT WILL BE MORE EXPENSIVE
  • ASSUME YOUR PROJECT WILL TAKE LONGER THAN EXPECTED

Failure to accept these four statements will set you up for grave disappointment.

Standards for workmanship should be clearly specified in contract between you and your builder. For post-frame buildings this would be Construction Tolerance Standards for Post-Frame Buildings (ASAE Paper 984002) and Metal Panel and Trim Installation Tolerances (ASAE Paper 054117). Depending upon scope of work, other standards may apply such as ACI (American Concrete Institute) 318, ACI Concrete Manual and APA guidelines (American Plywood Association).

During Construction

Visit Your Site

Tend to your site often. Show up at least twice a week (if not daily). During your visit, take pictures, lots of pictures. Purchase a camera with a Date and Time Stamp. Identify areas, in picture, with some type of signage, “Master Bedroom from Door Entrance” would be an example. By your project end you should have hundreds of pictures of every phase. Get a thumb drive if needed. Be able to read your “Approved Drawings” as well as all Installation Instructions.

Site Conditions

I cannot stress this enough, it has been my experience the single biggest project quality indicator is organization. A good job site should seem organized. If your project site is disorganized, trashy, and cluttered, so is your project. This should be your indicator to take more pictures and notify the contractor this is unsatisfactory. Every sub-contractor should have a clause in their contract that they should clean up their mess. It also means your contractor either doesn’t care or is not holding their Subs accountable. If you do not want to be responsible for clean-up and hauling off trash, make certain to include this in the contract.

Under no Circumstances Provide Assistance.

An impulse to “help” or “get a job done” is natural. Remember once you touch something, or provide support in any way, you have some liability. Every trade should have all needed tools, power, and equipment for the job they are doing. They are supposedly Professionals.

Keep Meticulous Records

Keep every bill, every material delivery, and every correspondence. Always communicate in writing with contractors. If you have a phone call, back it up with at least an email summarizing your conversation and get a response. Never delete an email. You might want to set up a new account just for your project. Never, ever, take “their word” for anything. ANYTHING.

Hire an Architect to view your project at Framing. 

Have a Registered Architect do a “Site Visit” once framing is complete and before interior finishes. Not only will he/she look at structural components, but this is when to catch issues potentially causing future challenges. They should give you a written report regarding any deficiencies in quality per specifications in your contract, engineered building plans and assembly instructions. This is money well spent and will potentially save you thousands over your building’s life. Give this report to your contractor and get a date by when these items will be corrected–in writing!

Do Not Pay for Anything not On-Site or Completed

Re-read this over and over. 

Make payments for materials jointly to contractor AND supplier (avoids liens). Better yet – order and pay for materials yourself!

Require written lien releases from all parties who have provided materials or labor through your contractor.

When your contractor says he or she is completed, again have your architect walk through with you. Make a written “punch list” of all deficiencies discovered and provide to the contractor. Only once all of these items have been corrected and an Occupancy Permit has been provided from your Building Department, should you make final payment.

Do Not pay ahead on a promise!

After reading all of this you may be wondering what you are paying a contractor to do, as your frequent involvement is needed in order to achieve your ideal dream outcome. If this happens to be your case, it may behoove you to pocket these funds and do it yourself!

Now, on to your questions.

From Construction Tolerance Standards for Post-Frame Buildings

“6.1 Plumbness. At the time of placement, no portion of a post should deviate from a plumb line (extending upward from the base of the post) more than 1% of the post height.”

On a 16’ eave, columns could be 1-59/64” out of plumb and still be considered within tolerance. An inch in eight feet would be outside of tolerance.

“6.5 Diagonal measurements. Corner-to-corner diagonal measurements should be taken at the finished floor and compared to determine the squareness of a rectangular area. These diagonal measurements should not deviate from each other by more than 2 inches or 0.5% of the length of the shortest side of the rectangle, whichever is greater.”

0.5% of length of shortest side would be 60 feet x 0.005 or 0.3 feet. Since this equals 3.60 inches, allowable difference in diagonal measurements would be increased from 2 to 3.6 inches. If squareness of an individual bay in same building is being checked, and post spacing is 8 feet, then rectangular area would be 8- by 60- feet, and 0.5% of length of shortest side of this rectangle would equal 8 feet x 0.005 or 0.06 feet (3/4 inch). Since this is less than 2 inches, allowable difference in diagonal measurements would be increased to 2 inches.

During construction, your overhead door openings should have had their jambs shimmed to be plumb. Interior and exterior steel panels on each side of overhead door opening should be removed, door jambs appropriately shimmed to vertical, then steel panels reordered and cut and installed to properly fit along each side of opening.

A Contractor for Your New Barndominium

A Contractor for Your Barndominium (Part I)

I have done my best to be a member of any barndominium, shouse (shop/house) or post frame house discussion group on Facebook with any sort of activity. If I had a quarter for every post from people looking for a building contractor, I could head to a casino and play quarter slots for days!

In my humble opinion, looking for a general contractor before one owns land and has settled on a custom designed floor plan to best fit their property, their wants and needs, is entirely foolhardy.

My previous writings have espoused how to thoroughly vet a contractor. I am going to wax poetic here and give a few pointers few of you will follow (although all of you should).

Your work starts before you sign a contract.

  • ASSUME YOUR PROJECT WILL END IN COURT
  • ASSUME YOUR CONTRACTOR IS UNTRUTHFUL
  • ASSUME YOUR PROJECT WILL BE MORE EXPENSIVE
  • ASSUME YOUR PROJECT WILL TAKE LONGER THAN EXPECTED

Failure to accept these four statements will set you up for grave disappointment.

Don’t let price or warranty be your only guide.

Many building owners subscribe to a concept of obtaining three bids and if they all appear to be roughly equal, taking the lowest bidder. This is simply not always a good practice, especially if there is a large disparity between prices. Be extremely cautious of prices substantially lower than others. It can mean a mistake has been made, or something is being left out. Compare all specified items carefully for discrepancies. Do not assume everyone has included all items (this happens frequently). Low bid Contractor may be planning on shortcuts in quality, making you ultimate loser.

Be wary of unusually long warranties as an enticement. It is reasonable to expect a year or two of warranty for labor.

Read contract thoroughly, including all terms and conditions.

Keep in mind a good contract is written to provide clear communication between the two parties.  It also protects both parties, and should never be “one sided”.  From my years as a general contractor, a well thought and spelled out contract (in writing) made for smoothest projects. 

Before agreeing to any work (as well as making any payment), require a written proposal describing in plain language what work will be done. Do not sign a contract you do not fully understand. If anything makes little or no sense, ask for a written explanation. Still feel dazed and confused, or not getting what you feel are straight answers? Pay a one-time fee so a lawyer can walk you through what, exactly it says and alert you to vague language. Terms such as “Industry Standard” have no real definition.

A total price should be as inclusive as possible. Any unforeseeable work or unit prices should be clearly addressed (like what happens if holes are difficult to dig). Maintain all paperwork, plans and permits when job is done, for future reference.

Familiarize yourself with contract terms.

Contractor’s proposals and contracts should contain specific terms and conditions. As with any contract, such terms spell out obligations of both parties, and should be read carefully. Be wary of extremely short or vaguely worded contracts. A well written contract should address all possibilities and may very well take more than one page. Payment terms may vary, however most will require payment in full upon completion of all work. Do not pay for all work until the Contractor has finished the job.

A statement regarding compliance with applicable Building Codes should be included. If contractor is doing building permit acquisition, it should be stated in writing and a copy of the permit should be provided prior to work starting.

Standards for workmanship should be clearly specified. For post-frame buildings this would be Construction Tolerance Standards for Post-Frame Buildings (ASAE Paper 984002) and Metal Panel and Trim Installation Tolerances (ASAE Paper 054117). Depending upon the scope of work, other standards may apply such as ACI (American Concrete Institute) 318, ACI Concrete Manual and APA guidelines (American Plywood Association).

Tune in tomorrow for Part II