Life has now ended….nothing worse could ever happen…..ever….send my money back.
No – failure to get through an initial plan check is not a reason for suicide planning, or to be jumping up and down screaming.
Whether the building (or just plans) were provided by us, or anyone else – the first step is to get a copy of why the plans were rejected – in writing, and forward to whomever the responsible party is. In the case of Hansen Pole Buildings, send the checklist to us, not the RDP (registered design professional, aka engineer).
Why get it in writing? Ever play the “sit in a circle and whisper a secret to your neighbor” game as a child? The same applies to a plan check. Don’t leave anything to interpretation – get it in black and white.
While the great majority of plans sail through on the first try, it is not always the case. And why not?
Reason #1 – The client failed to verify their Building Code version and load conditions with the Building Department prior to ordering their building. I cannot speak for anyone else, but we DO REQUIRE our clients to verify this information.
Reason #2 – Failure to submit all required documents. Besides the building plans, a plot plan is a requirement. Where is the building located in regards to lot lines and other structures? If the plans are sealed by an engineer, the engineer’s calculations must be submitted as well. Engineer sealed truss drawings don’t come with the plans necessarily and the plans checker will kick the plans back without them. Often, they come directly from the truss manufacturer.
Reason #3 – Didn’t discuss the proposed building with the Planning Department in advance. The Planning Department has the power of life and death. They could care less about how the structure is built. BUT – if your planned building is too tall, too large, too close to something they value and everything gets thrown into a blender on puree. This is probably the most difficult of plan check failures to fix….after the fact. Heed my advice: don’t use the old adage “better to feign ignorance and beg forgiveness later”. Trust me – this is not how to get your building to pass the plan check!
The least likely reason for failure to pass a plan check – is the structure itself, especially if the plans are sealed by an RDP. It is not just our engineers who are brilliant, it is engineers who have had to spend years of education and work experience to be able to perform their duties responsibly.