Tag Archives: building setbacks

Building Department Checklist Part I

BUILDING DEPARTMENT CHECKLIST 2020 PART I

I Can Build, I Can Build!

Whoa there Nellie…..before getting all carried away, there are 14 essential questions to have on your Building Department Checklist, in order to ensure structural portions of your new building process goes off without a hitch.  I will cover the first seven today, finishing up tomorrow, so you have a chance to take notes, start your own home file folder of “what to do before I build”.  Careful preparation will be key to having a successful building outcome (whether post frame or some other structural building system).

Provide answers to these questions to your potential building providers!

IMPORTANT SIDE NOTE: Building Departments’ required snow and wind loads are absolute minimums in an attempt to prevent loss of life during extreme events. They are not established to prevent your building from being destroyed. Consider asking your providers for added investment required to increase wind and/or snow loads beyond these minimums.

#1 What are required setbacks from streets, property lines, existing structures, septic systems, etc.?

Seemingly every jurisdiction has its own set of rules when it comes to setbacks. Want to build closer to a property line or existing structure than distance given? Ask about firewalls. If your building includes a firewall, you can often build closer to a property line. Creating an unusable space between your new building and a property line isn’t very practical. Being able to minimize this space could easily offset a small firewall investment. As far as my experience, you cannot dump weather (rain or snow) off a roof onto any neighbor’s lot, or into an alleyway – so keep those factors in mind.

#2 What Building Code will be applicable to this building?

Code is Code, right? Except when it has a “residential” and also has a “building” version and they do not entirely agree with each other.

Also, every three years Building Codes get a rewrite. One might not think there should be many changes. Surprise! With new research even things seemingly as simple as how snow loads are applied to roofs…changes. Obviously important to know what Code version (e.g. 2012, 2015, 2018, 2021) will be used.

 

#3 If building will be in snow country, what is GROUND snow load (abbreviated as Pg)?

Make sure you are clear in asking this question specific to “ground”. When you get to #4, you will see why.  Too many times we’ve had clients who asked their building official what their “snow load” will be, and B.O. (Building Official) replied using whichever value they are used to quoting.  Lost in communication was being specific about “ground” or “roof” snow load.

As well, what snow exposure factor (Ce) applies where a building will be located? Put simply, will the roof be fully exposed to wind from all directions, partially exposed to wind, or sheltered by being located tight in among conifer trees qualifying as obstructions? Right now will be a good time to stand at your proposed building site and take pictures in all four directions, and then getting your B.O. to give their determination of snow exposure factor, based upon these photos.

#4 What is Flat Roof Snow Load (Pf)?

Since 2000, Building Codes are written with flat roof snow load being calculated from ground snow load. Design snow load has become quite a science, taking into account a myriad of variables to arrive with a specific roof load for any given set of circumstances.

Unfortunately, some Building Departments have yet to come to grips with this, so they mandate use of a specified flat roof snow load, ignoring laws of physics.

Make certain to clearly understand information provided by your Building Department in regards to snow loads. Failure to do so could result in an expensive lesson.

#5 What is “Ultimate Design” or Vult wind speed in miles per hour?

Lowest possible Vult wind speed (100 miles per hour) only applies in three possible states – California, Oregon and Washington for Risk Category I structures. Everywhere else has a minimum of 105 mph.  Highest United States requirement of 200 mph for Risk Category III and IV buildings comes along portions of Florida’s coastline (although there are scattered areas nationally defined as “Special Wind Regions).  Don’t assume a friend of yours who lives in your same city has your same wind speed.  City of Tacoma, WA has six different wind speeds within city limits!

Vult and nominal design wind speed (Vasd) are different and an errant choice could result in significant under design (or failure). Make certain to always get Vult values.

#6 What is wind exposure (B, C or D)?

Please Take a few minutes to understand their differences:

(https://www.hansenpolebuildings.com/2012/03/wind-exposure-confusion/).

A Building Department can add hundreds, or even thousands, of dollars to your project cost, by trying to mandate an excessive wind exposure.  Once again, a good place for photographs in all four directions from your building site being shared with your Building Department.  Some jurisdictions “assume” worst case scenarios.  Meaning, your property could very well have all four sides protected and easily “fit” category B wind exposure requirements.  However, your jurisdiction may have their own requirement for every site in their jurisdiction to be wind exposure C, no matter what.  It’s their call.

#7 Are “wind rated” overhead doors required?

Usually this requirements enforcement occurs in hurricane regions. My personal opinion – if buying an overhead door, invest a few extra dollars to get one rated for design wind speeds where your building will be constructed. Truly a “better safe, than sorry” type situation.

I’ve covered seven most important questions for your Building Department Checklist, and they really weren’t so difficult, were they?  Come back tomorrow to find out the last seven!

Your Barndominium’s Planning Department

In most parts of our country (and probably most other developed countries), it will be a necessity to acquire a building permit in order to construct a new barndominium, shouse (shop/house) or post frame home. Easiest way to find out is to contact your local authorities to find out if indeed this is your case.

Whether a structural building permit will be required or not, there is some homework to be done before ever considering contacting anyone to get pricing on a new building.

Don’t worry –this homework is not difficult and there is no final exam!

Call your local Planning Department.

If no Planning Department is listed when you do a Google search, a call to city hall, or your county courthouse can get one directed to proper authorities. Just let them know a new home is being considered to be constructed, and they will tell you what you need to do to satisfy any local requirements.

When planning folks are reached, give them the physical address or parcel number where your barndominium (shouse) being thought about will be constructed.

Tell them what you would like to build.

Approximate footprint size is a place to start. Let them know where on your parcel your new building will ideally be placed.

Ask your planning people what restrictions there may be on a new building. Is it limited in size or in height? Setbacks – how far away must it be located from other buildings, property lines, streets, sewer lines, septic systems or drain fields? Are there any other restrictions prohibiting your building from being constructed, such as amount of square footage of residence in relationship to garage/shop areas? Are there restrictions on roofing and/or siding types, materials or colors?

While a telephone call will often handle most of these questions, it may be necessary to draw a scaled drawing of your property. If so, this drawing should show all property lines, existing structures, your new proposed building, as well as anything else acting as a possible impediment. It doesn’t have to be fancy, but please do use regular sheets of plain white paper, and not your local coffee shop napkins or paper towels!

A personal visit to your Planning Department, with this drawing in hand, should help to get all answers needed, in order to move on to the next steps.

A hint – if told there are restrictions keeping your ideal dream building from being able to be built, ask what processes exist to be able to move past some or all of these “objections”. Sometimes it’s just a matter of filing for a special type of permit or “variance”, and having your local commissioners vote on it.  You’d be surprised how many local jurisdictions have laws or rules which are “behind the times” and are happy to discuss changing them to better suit public wants and needs.

Building PermitI’ve found some Planning Departments are allowed to administratively go “beyond the rules” right there at the counter, without a need for costly and time consuming hearings. One example is within Spokane, Washington’s city limits. The largest allowable detached accessory building within city limits is 1000 square feet, however if requested at the counter, this footprint can be increased by 10%, right then and there!

As my Daddy used to tell me, “the asking is for free”, so don’t be shy.  Often a planning department official is not going to offer this information, so it’s up to you to ask lots of questions.  If you see other buildings near your building site similar to what you want to build, you can bet someone else figured out “the right questions to ask”.