Knee Bracing, Flying Gable Trim, and Ventilation Needs

This week the Pole Barn Guru answers reader questions about the removal of knee bracing to install interior ceiling and wall steel, a question about a special rake trim for a flying gable, and the possibility of adding ceiling liner panels to a structure and the need for a vapor barrier and proper ventilation.

Pole Barn Knee BracesDEAR POLE BARN GURU: Can I remove my knee bracing from the pole barn and put up interior ceiling and wall steel. I have a 60×104 pole barn on an 8″ wide 4′ high concrete wall with wet set braces (6×6 laminated beams. 8′ on center) ceiling is 16′ from floor my knee bracing takes up too much wall storage space. They brought them too far down the wall. About 6′. SEAN in MONTPELIER

DEAR SEAN: While knee braces generally cause far more structural harm, than good, they should never be removed without written authorization from whomever your building’s engineer is. If your building was not engineered (hopefully it was), then you should at least request written authorization from your provider including verification their removal will not affect any structural warranty.

In this article, another person dealt with similar issues: https://www.hansenpolebuildings.com/2015/11/can-i-take-out-knee-braces/

 

DEAR POLE BARN GURU: How do I trim out a metal ribbed roof panel on a barn with a widows peak? How do I make it match up with the rake trim? While maintaining proper drainage. KEVIN in LINCOLN

DEAR KEVIN: Your building kit provider should have had delivered to you one or more ‘special’ rake trims (one long side like a standard rake/corner trim, other flat with a hem) and some Emseal expanding closures. Here are your installation instructions: https://www.hansenpolebuildings.com/2016/05/9-steps-constructing-widows-peak/

 

DEAR POLE BARN GURU: I have a pole barn with a scissor truss (interior sloped ceiling) at 8′ on center. The builder placed insulation between the trusses and are kept from sagging by perpendicular metal straps approximately 2′ apart. When the breeze blows into the shop, the insulation batts float up and down like waves. I was thinking of installing a metal ceiling. I am concerned about the 8′ span between trusses and the possible need for a vapor barrier. What do you recommend? GREG in HUDSON

vented-closure-stripDEAR GREG: Hopefully you have vented eave soffits and ridge cap in correct ratios as lack of ventilation or too much or too little in wrong places can cause challenges (please read more here: https://www.hansenpolebuildings.com/2018/03/adequate-eave-ridge-ventilation/).

In your Climate Zone a ceiling vapor barrier should prove unnecessary. While I would not span eight feet with ceiling liner panels, I do see it being done successfully by many builders and specifiers.

 

UC-4B Treated Columns, A Connecting Structure, and Custom Options

This Monday the Pole Barn Guru answers reader questions about UC-4B treated columns, advice to connect a new structure to existing building, and if one can customize a monitor style building to eliminate pony wall.

DEAR POLE BARN GURU: We are considering residential post frame construction in southeast Ohio. I’m concerned about wood posts in the ground and trying to avoid permacolumns. I asked the post frame contractor I’m talking to about UC4 treated posts in the ground, specifically UC4B. His response was that building codes changed in the last couple years and all UC4 posts are now treated at the same level, there is no more UC4A/B/C distinction. In your expert opinion, is that information correct? Should I continue discussions with this contractor or walk away? RORY in CHILLICOTHE

DEAR RORY: Your proposed building contractor is talking out of his……..(not mouth) as he obviously has no clue as to what he is talking about. Building Codes dictate UC-4B pressure treating levels for lumber to be embedded in ground structurally. You can look this up yourself at: https://codes.iccsafe.org/content/IBC2021P1/chapter-18-soils-and-foundations#IBC2021P1_Ch18_Sec1807   Go to subsection 1807.3.1

American Wood Protection Association has a detailed listing relating use categories to placement – please  to upper left on Page 3 of this document for definition and where to use UC-4B treated wood. https://awpa.com/images/standards/U1excerpt.pdf


In my humble opinion, it may behoove you to deal with a supplier who can provide you with a fully engineered post frame home to meet Building Code requirements and either erect shell yourself or hire an erector to assemble it for you.

 

DEAR POLE BARN GURU: The picture is of my existing 30x40x10 Pole Barn.  One the back side I’m planning to build an attached a 26X40X16 barn.  The peaks of the barns will in the same direction and aligned in the center.  There is no rear overhang on the existing barn, just a piece of trim like you can seen in the picture on the front side.

My question:  how do I make the connection between the roof on the existing barn and the new wall where they attach?  I can see from some of the pictures on your website that this is somewhat common, but couldn’t find any details.  

The roof on the existing barn is shingles (not steel), will that pose any problems?

If you need more pictures or any other info let me know and I’ll get it for you.

Thank you very much. JON in WAYNE

 

DEAR JON: Assuming new endwall columns for your addition can be placed directly against your existing endwall – framing will extend 1-1/2″ past these columns (effectively creating an overlap above your existing building). A piece of flashing known as sidewall, will go up your new endwall and lap onto your existing roof. Being as your existing roof has shingles, I would order Emseal expanding closures to use on underside of this flashing to seal against water infiltration. Sticky side of Emseal can be placed on flashing (inside of drip leg) and it will expand after installation to fill any irregularities. Wall steel is then applied to overlap this flashing.

 

DEAR POLE BARN GURU: Is it reasonable to design a monitor style pole barn home: 1.5 stories With the central roof lines connecting into the shed roof sides, without the traditional short wall seen on most exteriors? Will I run into trouble creating head space in the central alley of the second floor? I have looked at attic trusses and mono trusses…I had thought to get an 18′ wide, alley with pony/short walls of 4′ – 5′. But it looks like the cut off is 16′ wide with a squared off 8′ tall ceiling. I suppose I could do with the more traditional look, but I want to keep a low profile, and would rather have the ceiling follow the roof line on the interior and not have it be squared off. Is this possible with a pre-built truss system?

Thank you, I love your blog. AMY in STANWOOD

About Hansen BuildingsDEAR AMY: Thank you for your kind words. Depending upon width of side sheds, we could probably have your building engineered using rafters at attached to shed eave side columns, main columns and cantilevered over center portion. Same concept could also be done using parallel chord trusses, however they would take up more depth. In either case, you could have a vaulted ceiling to follow roof lines.

 

 

Sliding Door Size, Floor Heat & Post Rot, and Trimming an Addition

Today’s Pole Barn Guru discusses Sliding Door Size, Floor Heat & Post Rot, and Trimming an Addition.

DEAR POLE BARN GURU: I have a shed in Holman Wisconsin with 12 ft high by 12 ft wide doors on it. The header is 13-6 can 13 ft high by 12 wide sliding door b installed? JEFF in HOLMAN

14-0620 Monitor BarnDEAR JEFF: Assuming standard post frame building construction where top of concrete slab is 3-1/2″ above bottom of pressure preservative treated splash plank. From bottom of splash plank to bottom of sliding door header would need to be 13′ 4-3/4″ to allow for a 13 foot tall sliding door.

 

 

DEAR POLE BARN GURU: In floor heat and poll life. Would higher temps from in floor heat reduce the life span of treatment and also improve the environment for decay organisms? VINCENT in CHAFFEE

DEAR VINCENT: As pressure treatment chemicals bond to wood at a cellular level, unless your floor heat was hot enough to cause combustion, it is highly unlikely lifespan would be reduced.

Growth of wood-rotting fungi is affected by temperature similar to growth of ordinary green plants. It is faster in warm weather than in cold. There are variations in response to temperature, and for each species there is an optimum at which growth is most rapid. Forest Products Laboratories tests and others on a number of species of fungi common in Canada indicate temperature conditions for optimum growth range from 65 to 95°F. All fungi show little or no growth at freezing temperatures or slightly above, but most wood rotting fungi are not killed by temperatures well below freezing point. They can withstand winter’s cold in a dormant state and can recommence active growth when temperatures increase again if other conditions are right.

Growth becomes less rapid as temperatures are increased above 95°F and ceases for most fungi at temperatures slightly in excess of 100°F. Prolonged exposure to temperatures slightly above maximum for growth, or even short exposure to temperatures much above maximum, can kill fungus completely. Actual death point is influenced by temperature, length of time and moisture content.

In theory, this means your heated floor could actually be responsible for killing decay organisms.

 

DEAR POLE BARN GURU: Hey I found you thru Hansen Buildings and had a question you might be able to answer just built a 24 x 16 pole barn and on the left and right added sheds but only half the building length what do I do with my gable trim that ends in the eave on the roof side of it just don’t know how to end it? JEREMY in SILETZ

DEAR JEREMY: Run gable (rake) trim up to main building roof steel edge, with a factory (uncut by you) end towards main roof. Use Emseal® (https://www.hansenpolebuildings.com/2016/03/emseal-self-expanding-sealant-tape-closures/) between top edge of trim and underlying roofing to create a tight water seal.