Who is Responsible for Verifying Design Loads?

Who is Responsible for Verifying Design Loads by Contract?

Disclaimer – this and subsequent articles on this subject are not intended to be legal advice, merely an example for discussions between you and your legal advisor.

Please keep in mind, many of these terms are applicable towards post frame building kits and would require edits for cases where a builder is providing erection services or materials and labor.

DESIGN LOADS/CONDITIONS: Plan, drafting, engineering or calculation changes needed due to Purchaser’s failure to adequately confirm criteria in this section, or Purchaser’s desire to change building dimensions or features, will result in a minimum $xxx charge.

It is solely upon Purchaser to verify with Purchaser’s Planning and/or Building Departments, or any other appropriate government, or non-governmental agencies, the ability to construct purchased building(s) at location anticipated, as well as to apply for and obtain any needed permits. All due diligence to comply with any architectural or aesthetic covenants must be done by Purchaser, and Purchaser agrees to absorb any costs associated with compliance.

Purchaser acknowledges verification/confirmation/acceptance of all Building Code, Plan and Design Criteria included on Instant Invoice. Information Purchaser has verified includes, but is not limited to: Applicable Building Code version, Occupancy Category, Ground (Pg) and Flat Roof (Pf) Snow Loads, Roof Snow Exposure Factor (Ce), Thermal Factor (Ct), Wind Speed (vult or 3 second gust) and Wind Exposure, Allowable Foundation Pressure, Seismic Zone and Maximum Frost Depth, as well as obtaining for Seller any unusual code interpretations or amendments.

Seller’s designs are all per specified Building Code and include the use of NDS Table 2.3.2 Load Duration Factors (Cd) as well as ASCE 7, Eq. 7-2 for slippery surfaces. Seller’s designs rely solely upon occupancy category and structural criteria for and at specified job site address only, which have been provided and/or verified by Purchaser. 

It is Purchaser’s and only Purchaser’s responsibility to ascertain the design loads utilized in this Agreement meet or exceed the actual dead loads imposed on the structure and the live loads imposed by the local building code or historical climactic records. Purchaser understands Seller and/or third party engineer(s) or agents will NOT be contacting anyone to confirm.

Dead loads specified on engineered roof truss drawings include the weight of the roof truss. Roof trusses are NOT designed to support ANY hanging loads or ceiling loads other than those specified as special truss loads in the Agreement. In the case of design roof truss bottom chord loads of less than five (5) psf (pounds per square foot) the bottom chord dead load may be sufficient only to cover the truss weight itself and may not allow for any additional load to be added to the bottom chord.

Roof truss top chord design loads of 5 psf (or less) are not adequate for roofing other than light gauge steel.

Seller recommends use of A1V (aluminum/single air cell/vinyl) radiant reflective barrier, an Integral Condensation Control (I.C.C. – Dripstop, Condenstop or similar), solid sheathing (with appropriate underlayment) or Purchaser applied 2″ or thicker closed cell spray foam insulation to help control roof condensation. 

In no case is Seller liable for any condensation issues. An I.C.C., when ordered, is manufacturer applied to roof steel panels only. Seller makes no representation of any R or U value for any insulation or insulation products supplied. In the event Purchaser opts to utilize snow loads, wind loads, wind exposure factors, seismic loads or ventilation of less than those recommended by Seller, or soil bearing capacities greater than those recommended by Seller, Seller and third party engineer(s) are totally absolved of any and all structural responsibility.

Any windows and/or doors provided by Seller are NOT wind-rated, unless specifically noted as such.

Any possible design responsibility for this building is null and void should any structural materials and/or construction be substituted, replaced, depart, deviate, or are otherwise altered from the Seller’s original building kit they belong to, including structural materials from suppliers not authorized in writing by Seller’s owner, or if building is constructed at an address other than as specified on plans.

Getting the Best Deal on Your New Post Frame Building

A price quote is merely a number without a complete understanding of exactly what is or is not included in said quote.

You have requested quotes for your new post frame building from a dozen or more providers and actually gotten four back, even after having to hound all of them for pricing! Frustrating when you are ‘knocking at their door’ trying to spend your cash.

One quote stood out above all others with an exceptional price, so you place your order. Only after “everything” arrives and you try to assemble it do you find out what you thought you bought and what you really purchased are not quite equal.

Disappointing.

If you prefer to read books by starting with the last chapter, you can skip to there to find a solution.

Here are a few points to be aware of:

Will Your Building Meet Minimum Building Code Standards?

Those quotes you got….few, if any, will specify what loads your building are designed for.

Some of them will just be a list of materials! Are they right? Is there even enough there to construct a building?

Every quote should include (at a minimum): engineer sealed plans specific to your building at your site. Complete Building Code information – including Code version (there is a new one every three years), Ground snow load (Pg), Flat roof snow load (Pf), Design wind speed (Vult or Vasd), Wind Exposure (there is a big difference between Exposure B and C) and assumed soil bearing pressures.

You can easily acquire this information for yourself, so you have a point to check from: https://www.hansenpolebuildings.com/2019/01/building-department-checklist-2019-part-1/

If Code information is not on a quote, chuck it.

Do Roof Trusses Quoted Meet Your Needs?

Here is where investing in an engineered building comes into play, as your Engineer of Record (person who seals your building plans) should be reviewing prefabricated roof truss drawings for their adequacy for his or her building.

Planning on supporting a ceiling, either now or at a later date? If so a ceiling load of no less than five pounds per square foot (psf) should be indicated on engineered plans as well as a BCDL (Bottom Chord Dead Load) to match on sealed truss drawings.

At Hansen Pole Buildings, we ran into this situation so often, we decided to upgrade all trusses up to 40 foot clearspan to support a minimum five psf load.

 

How is Roof Steel Condensation Being Controlled? Most providers are not even going to mention this. Most of us prefer it not to rain inside of our new buildings. 

I answer questions online every Monday. Problem/question number one is regarding condensation.

From cheapest up – a Radiant Reflective Barrier (aka bubble wrap – if going this route you only need single bubble, six foot wide rolls with an adhesive pull strip); Integral Condensation Control (https://www.hansenpolebuildings.com/2017/03/integral-condensation-control/); Sheathing with 30# felt; Closed cell spray foam.

Planning on insulating and finishing walls? If not using closed cell spray foam you will want to apply a Weather Resistant Barrier between wall framing and steel siding.

What Written Warranty Comes With Your Building?

If it does, how long does it last? What does it include? When it comes to Post Frame Building kits, Hansen Pole Buildings stands alone with a Limited Lifetime Structural Warranty (https://www.hansenpolebuildings.com/2015/11/pole-building-warranty/).

Are Assembly Instructions Included?

If not, there is plenty left to chance. Hansen Pole Buildings provides a fully illustrated, step-by-step 500 page Construction Manual. And, if you get stuck, there is unlimited FREE Technical Support from people who have actually assembled buildings!

 

How About Your Potential Provider?

How long have they been in business 2 years, 5 years? How about 18 years? How many post frame buildings have they provided? How about roughly 20 thousand buildings located in ALL 50 states!

Here is how to vet any potential provider: https://www.hansenpolebuildings.com/2015/01/pole-building-suppliers/

I promised you a solution (aka Last Chapter of Book)

We are offering to shop for you.  Seriously? Yes! You provide up to three names of competitors to Hansen Buildings, where you can purchase a complete wood framed post frame building kit package, and we will shop them to get quotes for you.

Now we say three, because frankly, some people just are not very prompt or cooperative when it comes to getting back with price quotes.

Why would we do this?  Comparing “apples to apples”, we know our price will beat theirs, every single time. We offer to do this for your peace of mind.   We guarantee all other prices will be higher.  And we will provide you with documentation to prove it!

There is a catch…..before we go shopping you have to place your order for your new Hansen Pole Building kit….. subject to us “proving our point” by going shopping. Your payment to us will not be processed for ten calendar days. Within seven days of order, you’ll have competitive quotes in hand, or our documentation of having hounded them every week day for a week trying to get pricing for you (seriously, if you have to hound someone for a price, what kind of after sale service will you get?). 

After we email you proof, if you seriously want to purchase from one of these competitors, just let us know before ten days pass and we tear everything up and go away friends.