Tag Archives: inspection

Contracts: Inspect It, Inventory It

Disclaimer – this and subsequent articles on this subject are not intended to be legal advice, merely an example for discussions between you and your legal advisor.

Please keep in mind, many of these terms are applicable towards post frame building kits and would require edits for cases where a builder is providing erection services or materials and labor.

It may behoove you to read this article first: https://www.hansenpolebuildings.com/2011/12/building-materials/

INSPECTION/INVENTORY: Purchaser must inspect and inventory, at Purchaser’s sole expense, all items delivered (including doors and accompanying hardware, each piece of lumber, siding or roofing, trims, etc., whether arriving individually, in sealed containers or unitized) and report, within 48 hours, any and all “hidden damage”, missing or damaged goods, claimed nonconformity, defects or differences between the goods and materials described in the Agreement, or an approved Change Order, and as received by Purchaser. 

The ONLY method of reporting is through Seller’s online account page, as Emailed or telephone reports cannot be accepted. All damage/unusable reports must include digital photos. Any materials reported by Purchaser and verified as being damaged or unusable within 48 hours after delivery can be exchanged at the supplier’s location for a replacement with absolutely no charge to Purchaser. Any confirmed shortages reported within 48 hours after delivery will be delivered as quickly as is reasonably possible or Seller will arrange for Purchaser to “will call” at a location within vicinity of the site, either with no charge to Purchaser. 

At time of delivery, Purchaser must note any obvious shortage or damage on the bill(s) of lading. Once the 48 hours Inventory Time after material delivery has expired, should you question quantity/size/grade or color of materials delivered, a $120 deposit will be required for Hansen Buildings to recount all materials on your Material Takeoff. Should there be a shortage, your deposit will be returned along with any missing materials delivered as soon as reasonably possible. Should the materials delivered agree with the Material Takeoff, or you have an overage, you will not be required to return the extra materials. However the deposit will become property of Hansen Buildings.

PAYMENTS: In the event order includes a payment tied to the delivery of lumber (or any other specific delivery or time frame), those amounts will be automatically charged against method of payment selected by Purchaser at time of order, without need for prior notice, on or after the date of delivery, or time frame specified. Any payments not made when due, are subject to a late payment fee of 5% of the amount of the payment, plus interest at a rate of 1.5% per month, beginning the date payment was due. Other than the original online “Instant Invoice”, a re-billing fee of $50 will be paid by Purchaser for each and every invoice on Purchaser’s account.

It is Purchaser’s responsibility to have adequate funds available, in Purchaser’s account, to process any and all payments under terms of this Agreement. Seller will not be liable for any costs incurred by Purchaser for insufficient funds, other similar fees or charges.

Dishonored payments, for any reason, will be assessed a $40 fee. In the event Purchaser’s account must be turned over to collection, Purchaser agrees to pay the amounts owed to Seller PLUS collection costs of up to 50% of the amounts owed plus any court costs, filing and service fees, or attorney fees.

Seller may accept and process payments without losing any rights. Even if Seller credits Purchaser’s payment to Purchaser’s account, Seller may delay availability of further deliveries until Seller confirms payment has cleared. Seller may resubmit and electronically collect returned payments.

ALTERNATIVE PAYMENT SERVICES: Seller may make services available which allow Purchaser to make payments through a customer service representative, wire transfer, FedEx, USPS or other means rather than via the online portal. Seller will describe the terms for using these services, before Purchaser uses them. Purchaser does not have to use these other payment services, and Seller may charge a Fee for using them. If a Fee applies, Seller will tell Purchaser the amount of the Fee at the time service is requested. Seller is not responsible if a payment made using an alternative payment service is rejected or not paid. Even if it is, Seller may still keep the Fee.

CREDIT REPORTS: Seller may provide information about Purchaser and the Account to consumer (credit) reporting agencies, business reporting agencies and others as allowed. Information provided by Seller might appear on Purchaser’s credit reports. This could include negative information if the Purchaser does not comply with the terms of this Agreement.

ITEMS WITH RESTRICTIVE WORDS, CONDITIONS, OR INSTRUCTIONS: Both parties acknowledge any payments submitted by Purchaser with restrictive words, conditions, or instructions added (including Items marked with the words, “Paid in Full” or similar language) are to be accepted as payment towards the account of Purchaser only, and any such restrictive words, conditions, or instructions will not be binding upon the parties.

HOLDBACK: No holdbacks, back charges or retainages are allowable, for any reason.

UTILIZATION: Prior to complete payment of the balance owed on this Agreement, Purchaser shall refrain from utilizing the materials as described in the Agreement. If Purchaser uses any of the materials provided by Seller, prior to making full payment to Seller, Purchaser agrees unequivocally to accept materials as provided, and as is, without recourse.

Final Inspection, Framing Lumber, and Trusses

This Friday’s blog include some extra Pole Barn Guru reader’s questions about a final inspection, materials needs for a building, and the quantity of trusses for another.

Pole Building ShopDEAR POLE BARN GURU: In a pole barn the inspector will not pass final inspection with a crushed concrete floor for storage of any kind of vehicle inside without a signed affidavit of no-storage of vehicles inside.

Basically no solid concrete floor, no storage of vehicles inside. Is this correct for Michigan? DAN in WILLIAMSTON

DEAR DAN: Many jurisdictions all across America have enacted similar ordinances, most often in an effort to prevent petroleum based chemicals from potentially seeping into underground natural drinking water supplies and tainting them. When you do pour your concrete slab on grade, make sure to place a well-sealed vapor barrier underneath to prevent moisture from passing through. While Building Code minimum requirement is 6mil, we recommend 15mil to avoid punctures during placement of concrete.

 

DEAR POLE BARN GURU: Trying to figure out how many 2×4’s, 2×6’s and 2×10’s we will need for our 40x56x12 pole building with a 10×56 lean to attached. How do I figure board footage or how many of each I will need? RACHEL in LEONARD

Engineer sealed pole barnDEAR RACHEL: Your question leads me to believe you do not have structural plans for your building. Said structural plans should be prepared by a Registered Design Professional (RDP – architect or engineer) who can expertly determine structural adequacy of all building components, as well as proper connections.

There is an easy fix to your situation – order a fully engineered post frame building kit, custom designed to meet your every want and need. With a www.HansenPoleBuildings.com building, you will receive full sized (24″ x 36″) blueprints detailing every member and every connection. You will have an itemized material takeoff list to work from, a 500 page fully illustrated Construction Manual to guide you step-by-step through assembly and unlimited free Technical Support from people who have actually built post frame buildings.

A new post frame building is a major investment, please avoid making costly errors in an effort to save money. You get only a single chance to do it right or wrong – right is so much easier and more rewarding.

 

DEAR POLE BARN GURU: How many 2×4 trusses do I need for a 20ft x 30ft roof with only steel ruffing. DOUGLAS in PINCONNING

DEAR DOUGLAS: Your trusses should be shown on your building’s engineer sealed plans. You can provide these to any prefabricated wood roof truss manufacturer (or the ProDesk at your nearby The Home Depot) to get a quote delivered to your building site. If it was my own personal building, it would have a single truss on each endwall, and a double truss every 10 feet bearing directly upon wall columns. I would place 2x purlins on edge between truss top chords, using engineered steel joist hangers to support each end.