Nationwide®Insurance on Pole Building Failures Part 2

As my loyal readers know, I recently attended the NFBA (National Frame Building Association) 2014 Expo in Nashville, TN.  The NFBA (https://www.nfba.org) is the only national trade association which represents post-frame industry professionals. The association is the country’s primary source of post-frame building resources, research, networking, news and education.

This is Part II on a two part series based on a lecture at the NFBA Convention in Nashville (March 5-6-7) by Ryan Michalek of Nationwide® Insurance. See yesterday’s blog for part I.

Typically builders, when they do install bracing, will just run it laterally from one end of the building, to the other. What this does is it allows all of the trusses to bend together, as the loads being placed upon the bracing are not being transferred to a very stiff surface – like the roof diaphragm. By utilization of properly designed “X” braces, the lateral loads can be transferred into the plane of the roof, and keeping the trusses where they are happiest – upright.

In the Midwest, where Nationwide® Insurance’s engineer is based, the purlin/truss scenario is generally from one of two schools. What most would consider an “Eastern” U.S. style pole building, roof trusses are placed (usually every four feet) across a “truss carrier” at each end. Purlins are most typically 2x4s flat across the top of the trusses, and connected only by nails driven through the purlin into the truss.

The other scenario has widely spaced single trusses, usually anywhere from 7’6” to 10’ on center, and aligned with the sidewall truss bearing columns. Here, the roof purlins are 2×4 on edge, over the tops of the trusses, with a long thin nail driven thru the purlin into the top of the truss.

Pole Barn FailureFor sake of discussion, I’ll use a 50’ wide building, with Occupancy Category I (a building which represents a low hazard to human life in the event of failure). Under the 2012 International Building Code (IBC), for most of the country the lowest design wind speed for this Occupancy would be 105 mph. With a 14’ eave height and a 4/12 roof slope, with a B wind exposure, for an enclosed structure the uplift force on the truss 4’ in from the end of the building is 31.012 psf (46.014 psf within five feet of the eave and ridge).  This assumes a building with openings which are closed by wind rated doors (sliding barn doors are not wind rated).

With purlins 24 inches on center, and trusses every four feet, each connection has to resist eight square feet of uplift force, or 368 pounds in the most critical areas. For safety sake, we will assume the lowest Specific Gravity (G) of the most commonly used materials for trusses, G = 0.42 for Spruce-Pine-Fir. Using a 10d common nail (3” length x .0148” diameter) the withdrawal value is 23 pounds, per inch of nail into the top of the truss (since the nail penetrates 1-1/2” the value per nail would be 34.5 pounds). Adjusting for duration of load for wind, it would take SEVEN of these nails to hold the purlin to the truss. Of course there is no way to get seven nails into this connection. Even the less critical areas of the roof (more than 10% of the building width away from the end, ridge or eaves) would take three 10d commons, and there is only so much area to be nailing through!

What happens when the purlins go over the top of a single truss at say nine foot on center?

The truss is now going to be out of the “end zone” for wind, however some of the purlins are going to lie completely in the high force areas near the eave and ridge. Now we are talking about 18 square feet of roof with a total uplift force of 558.22 pounds! The most common method for resisting uplift in this scenario is to use a 60d threaded hardened nail. These nails have a withdrawal value of 35 pounds per inch of nail into the truss, so adjusted for duration of load, the nail would need to penetrate nearly 10 inches into the top chord!! As these nails are only six inches long, and 3-1/2 inches is consumed by the purlin, it would take FOUR of these to make an adequate connection.

Given the information above, it is easy to see how these buildings have been designed for failure of these critical connections. A solution would be to use appropriate engineered hangers to attach the purlins.

The third common area of failure is from designs where drifting snow causing unbalanced loads is not accounted for. Roof truss designers have the ability to turn to off the “switch” in their engineering design programs which accounts for drift loading. The result is an under designed truss, which is less expensive. As no structural design review is being done, no plan’s examiner will catch the trusses being inadequately designed.

Not only do the trusses need to support unbalanced snow loads, so do roof purlins. It is not unusual for an engineered building to have purlins either spaced closer together, or of higher grade or larger size in drift areas of the roof.

All of these failure conditions could be solved by requiring all structures to be designed by an RDP and to have a structural design review, prior to a permit being issued.

On a happy note – Nationwide® offers discounts of up to 10% on insuring buildings which have been designed by an engineer! Since each and every Hansen Building kit comes with free sealed plans, check and see if your carrier offers discounts on engineered pole barns.

When the presentation was completed, I was left feeling, “Nationwide is on your side®!”

 

Nationwide®Top Three Reasons Pole Buildings Fail

Nationwide® Insurance and Common Pole Building Failures

As my loyal readers know, I recently attended the NFBA (National Frame Building Association) 2014 Expo in Nashville, TN.  The NFBA (https://www.nfba.org) is the only national trade association which represents post-frame industry professionals. The association is the country’s primary source of post-frame building resources, research, networking, news and education.

While the NFBA Expo highlights for me are typically being able to interact with the hundreds of vendors who are displaying the latest pole building innovations and products on the trade show floor, this year the National Frame Building Association had a surprise in store for me.

The daily NFBA Expo “breakout” sessions included the fields of Sales and Marketing, Management and Technical Knowledge.

The surprise session for me was, “Avoiding Common Building Failures in the Post-Frame Industry”. The presenter was Ryan Michalek, a Registered Professional Engineer, who is one of several engineers employed by Nationwide® Insurance to help its policy holders avoid catastrophic structural building failures.

Let me begin by saying I am NOT a paid spokesperson for Nationwide® Insurance. In fact, I am not, nor have I ever had a policy issued by Nationwide®. Given their presenter’s informative presentation as an indicator, this could change in the future.

Nationwide® is one of the largest insurance and financial services companies in the world, focusing on domestic property and casualty insurance, life insurance and retirement savings, asset management, and strategic investments.  On December 17, 1925, the Ohio Farm Bureau Federation incorporated the Farm Bureau Mutual Automobile Insurance Company in Columbus, Ohio and In 1955, Farm Bureau Mutual changed its name to Nationwide® Insurance, a name by which it is commonly known today.

Truss-FramingThe “trailer” for this session was, “Would you find it surprising that Nationwide Insurance’s loss experience with post-frame buildings is disproportionately represented by newly constructed facilities? The company’s loss history is full of buildings that are less than 5 years old and that fail when subjected to their first moderate wind or snow loading event or to a modest commodity-loading cycle. This presentation discusses the common oversights in post-frame building design and construction which lead to building loss and offers strategies to eliminate these oversights.”

I quizzed Mr. Michalek myself as to how many of these failures were subjected to a structural plan review by a Building Official. His opinion was few, if any, of the buildings which failed were designed by a registered design professional RDP (registered engineer or architect), as they are nearly exclusively “agricultural” structures, which are exempted from the Building Permit process in many states.

My personal belief is every building should be designed by an RDP, (engineer) as well as being subjected to structural review by a Building Official. Knowing the size of the Insurance Industry, I questioned why it was Nationwide® and other insurance companies were not lobbying for stricter rules for these now permit exempt buildings. Mr. Michalek minced no words in stating the Agricultural lobby in the United States is far more powerful than the insurance industry.

Myself, I am just not understanding the thought processes of those who would invest in buildings which will underperform or fail structurally, all in the name of saving a few dollars. Considering many of the failures come from the poultry industry, it seems the cost and cleanup of a million dead chickens would trump the few dollars saved on construction.

What was surprising to me, was the actual most prevalent failures – although column size and embedment always seem to be big concerns from informed purchasers, it wasn’t a contributor to the three major causes of failures: lateral bracing of trusses; purlin to truss connections and unbalanced and snow drift loads on trusses.

Roof trusses function very well when loaded in the manner in which they are designed to be strong – vertically. I’ve discussed truss bracing before in this forum: https://www.hansenpolebuildings.com/blog/2013/10/bottom-chord-bracing/ and https://www.hansenpolebuildings.com/blog/2013/09/truss-bracing/

Come back tomorrow and I will give you examples of just how easily the wrong bracing can help a building to fail.