Post Too Deep, Termite Treatment, and Column Treatment

This week Mike the Pole Barn Guru answers reader questions about adding length to endwall post set too deep into ground in order to attach to end trusses, how to best prevent termites after slab and skirt have been poured, and if a UC-4B treatment would suffice on a “half wall” RV storage unit.

DEAR POLE BARN GURU: If you put couple of the laminated post too deep on an end wall can they be added upon to make them work and still be strong enough? A stupid rookie mistake on me. ALAN in KELSO

DEAR ALAN: Provided they are not corner columns, it might be possible, however would require engineering approval in order to do so. Engineer will need to know how far below end truss top(s) of columns will be.

 

DEAR POLE BARN GURU: Hi. I forgot to put termite treatment on the pad before building my 40×60 in Maryland. I now have 5″ concrete floor on inside and a 3 foot concrete skirt around the outside. My pad was crushed concrete aggregate and I have 2 foot round concrete footers around the poles. Would you recommend doing a typical treatment of drilling 6 inches from the wall and down 18 inches to fill w liquid or could i put the liquid on the outside of the 3 foot skirt? I’m assuming better to do this on the outside of building than on inside, agree? JAVO in PRINCE FREDERICK

termitesDEAR JAVO: I have, for better or worse, always lived in pretty much “The Great White North”, where termites are never a problem. In termite prone locales, pre-construction treatment is obviously a best case scenario (for extended reading: https://www.hansenpolebuildings.com/2019/09/pre-construction-termite-treatment/). In your circumstance, it would be best for me to defer and direct you to your local pest control experts, as they will know what best will meet your needs.

 

DEAR POLE BARN GURU: I am building a post frame pole barn with half walls to store an RV. I am planning on using 6×6 UC4B (CCA) posts suspended in a concrete footing/collar. They bottoms of the posts (gravel floor) will be exposed to weather (North Alabama) during blowing rain. My question is would a post protector or post sleeve be necessary or beneficial to protect against rot? And if so would a post protector need a weep hole with washed stone in this scenario? BENJAMIN in CHEROKEE

DEAR BENJAMIN: As long as you are using UC-4B rated treated timbers, and maintain proper termite treatments to your soil, rot should never be an issue. Half-walls can be problematic, as they do not allow for transfer of wind shear forces through siding to ground. You will want to make certain to build from engineer sealed site specific plans to ensure structural adequacy.

Blog Entries Lead to Post Depth Question!

DEAR POLE BARN GURU: Good morning.

I have been reading the various blog entries for several days, regarding pole barn construction.  I have been in contact with your design professional, but I a question that I thought might be a question that could possibly benefit others with a similar situation.

I am in the process of planning a 40X60 building for a shop for the business I have.  My planned (and only available) location has about 5′ of fall on the lot which would be on the 60′ side wall of the building.  I have built up a 50 X 70 pad.  This has been built up and compacted with red “clay” a term we use around here, referring to the material we call “fill” around here, generally used for the purpose of building up a building pad.  My original thoughts were to place a 6″ thick monolithic concrete pad with a footer, (I intend to run forklifts on it.) and erect a steel building kit.

Since the dirt pad was completed, I have since stumbled onto your site, and am looking at a pole building.  So, my question relates to setting poles.  How do you handle setting poles when half of the building will be over the top of built up soil base?  I know it can be done, and I am not concerned overly much with adequacy of the soil compaction, which at this point, it has been sitting for about 7 or 8 months since it was compacted, but it has not been tested for compaction.

But having never done this before, since I am not 100% sure, and have yet to dig holes, (but I do want to start later this spring) I wanted to know your thoughts before I proceed.

Thank you. WESSLEY in TRINITY

DEAR WESSLEY: And a fine good morning to you!

I believe you are going to find a post frame (pole) building to be a much more viable option for your new structure than all steel and this is why….

Although your fill has sat for 7-8 months, there is yet a chance of additional settling. Clay is also a very unstable soil to place footings upon – so if your consideration was to support a monolithic pad with a footing around the perimeter, unless the footing was at the depth of the undisturbed underlying soil there is a high degree of probability the building would settle or shift – leaving you an unhappy new building owner.

With your pole building – the columns which will be placed in the fill area should be ordered long enough so the base of the column (actually the concrete below the base of the column) will rest upon virgin soil. This will require some holes to be as deep as five feet, however most skid loader mounted augers will get this kind of depth. The columns placed in this manner should minimize the probability of issues from settling and give you a resulting structure which can be happily used for several generations.

DEAR POLE BARN GURU: I can build a 28×36 pole building with 12′ eaves on my lot. I would like double trusses spaced 12′ so I can have 3 bays. What would be the difference in truss design for one designed for roof load only compared to one that can also support a ceiling. Thank you. JIM in SALEM

DEAR JIM: At the bare basics – the trusses will have one or more of the following: higher grades of lumber used for top and or bottom chords; large lumber for top and or bottom chords; more internal truss webs; larger pressed steel connector plates.

Now some recommendations – when you have a ceiling, ventilation is required. The best way to do it is to have enclosed vented overhangs and a vented ridge. This gives both an air intake as well as an exhaust and gives smooth airflow throughout the entire enclosed attic space. If you are planning upon insulating the ceiling, raised heel trusses are the way to go (read more on the hows and whys of raised heel trusses here: https://www.hansenpolebuildings.com/2012/07/raised-heel-trusses/).

You get one opportunity to do your new building right or wrong, I’d sure like to see it done right!

DEAR POLE BARN GURU: I bought a house with an existing 38×26 pole barn. The barn has metal roof placed over 3/4″ rigid foam (ISO) screwed to the purlins (2X4 on edge). I can’t tell what the facing material is on the ISO, but its white and doesn’t seem like paper. There is noticeable water staining on the rigid foam which I believe is due to condensation. There is a vent ridge on the barn. The metal roof is a PBR profile. For the winter I would like to insulate the cathedral ceiling better (I don’t want to drop a ceiling as I have storage shelving that prevents this). What is the best option (besides spray foam). I was considering kraft faced batts stapled to the 24″ OC purlins. I could do an R13 since the purlins are 2X4s, but also considered an R19 and let the batts bulge out a bit as I’m not going to sheath it. I would have the ridge foam to butt up against which should allow ventilation on the opposite side still (adjacent to metal roof). What do you recommend? I have wood stove for heating in the winter time and use it to take the chill off when I work out there (ie not on all the time). PATRICK in INDIANAPOLIS

DEAR PATRICK: I am going to give you the answer you probably don’t want to hear…..the water staining is most probably due to roof leaks, rather than condensation. This happens when screws are placed through foam board, which causes the screw shanks to deform, slots to form beneath the screw heads and when the deformations or slots get large enough – it leaks. The best solution for the problem is to remove the roof panels, take out the insulation boards and throw them away, then reinstall the roof panels using 1-1/2 inch long screws with a larger diameter than what was previously used.

Placing any sort of batt insulation under the foam as it currently exists is just going to get you wet insulation. Trying to use R-19 insulation batts in a 3-1/2 inch cavity will net you R-13 as the insulation is only as effective as its fully expanded thickness.

Once you have removed the foam boards the solution seriously is to spray foam it. Code requires airflow from eave to ridge over the batt insulation, which is going to involve more work and cost than the foam – it would take two layers of 2×4 laid flat on top of the existing purlins, one set running up the roof and another set going the same direction as the purlins, to screw into. This will mess up any trims on the perimeter of the roof, resulting in purchasing larger coverage trims.

The original building owner’s lack of planning for future uses of the building have now become your expensive nightmare.

Which Way to Run Roof OSB

Welcome to Ask the Pole Barn Guru – where you can ask questions about building topics, with answers posted on Mondays.  With many questions to answer, please be patient to watch for yours to come up on a future Monday segment.  If you want a quick answer, please be sure to answer with a “reply-able” email address.

Email all questions to: PoleBarnGuru@HansenPoleBuildings.com

DEAR POLE BARN GURU: I have built a 40x64ft pole building with 14ft sidewalls. I have sheathed the entire walls with osb and intend on doing the same with roof osb. My trusses are 8ft on center with purlins running horizontal every 2ft on center. Should my roof osb be ran vertical or horizontal on the roof? Either way I will need roof clips between panels, just concerned which method would be best?

Please respond back if you can. STRESSED OUT IN WYOMING

DEAR STRESSED: Be stressed no longer!

Structurally the sheathing can be run in either direction and is equal in shear strength either way. My instinct tells me to run it up the roof – which is how I personally would install roof osb . Unless the building is being constructed under the IRC (International Residential Code) H clips are not a requirement: https://www.hansenpolebuildings.com/blog/2014/03/roof-sheathing-clips/

Before sheathing the roof, the engineered roof truss drawings should be reviewed to ascertain if they are designed to adequately carry the added weight of the sheathing. With steel roofing, a minimum of five psf (pounds per square foot) of top chord dead load would be needed.

Mike the Pole Barn Guru

DEAR POLE BARN GURU: Can a monitor style pole building be built with no interior posts but including a loft for light storage? I have received several quotes from Mark at Hansen and am getting close. Thanks!

GREGORY IN MARION

DEAR GREGORY ~ Can it and should it may not arrive at the same answer. There are three components to any construction design solution – imagination, budget and available space. You’ve got a lock on the imagination part (always my favorite). To begin with – clearspan monitor trusses can be designed for virtually any span, including the 40 foot width you have in mind. A couple of considerations – the first impacting looks, which is to make sure the “rise” in the center is tall enough to actually provide the monitor “look”. The second – try to keep the overall truss height to 12′ or less as not all wood truss manufacturers are capable of fabricating trusses taller than 12 feet and for the ones which can, the logistics of transportation increase the challenges (as well as costs).

In your particular case – the relatively low roof snow load requirements will help to offset the added costs to design for the light storage load capacity you are considering loading. As snow loads and spans increase the investment can easily outweigh the gain.

One other consideration is will you even use the space? With the requested 14 foot tall overhead door, the bottom of the trusses will be at least 15 feet above the concrete floor. Fifteen feet may prove inconvenient for loading stuff into the storage area.

Mike the Pole Barn Guru

DEAR POLE BARN GURU: How is the depth for each post determined? I’m assuming the soil type needs to be known, but is it ever the case where the structural integrity requires a deeper hole than the soil would allow without a massive auger? SAEPOR IN REYKJAVIK ICELAND

DEAR SAEPOR: Column depths and diameters are determined by the forces being applied to the column – wind, snow, seismic and applicable dead loads (weight of building). Unless otherwise informed, we generally use a value of 2000 psf (pounds per square foot) as an assumed soil bearing capacity – which is relatively conservative. Other than for extreme frost circumstances (such as where Hansen Buidings is – in Minnesota – which is 60”), rarely will a deeper column hole than 40 inches occur.

Mike the Pole Barn Guru