Site Prep, Brackets on Slab, and Treated Lumber

This Wednesday the Pole Barn Guru answers reader questions about site preparation and underground obstructions, a recommendation for building with wet set brackets on slab, and whether or not Hansen Buildings uses lumber treated for in-ground use– UC-4B.

DEAR POLE BARN GURU: We recently started the ground work for our future 48×72 pole building. Half way through excavation the crew hit a solid slab of rock at the corner of our building site. It appears to be Pennsylvania blue stone and the space that it takes up includes a majority of the back and left side where the building walls would sit. We were able to achieve a level pad but we are extremely concerned that now we won’t be able to build on this site. This is the only place on our property that has room for this build and we are very worried that we won’t be able to set poles in the ground do to the size of this solid slab. What are our options, if any? KIMBERLY in PENNSYLVANIA

DEAR KIMBERLY: This brought back childhood memories of my Dad taking me out on a Saturday to a site above Hayden Lake, Idaho where he and my uncles were going to be framing a custom home. Site had been cleared, and there were all sorts of roughly inch and one-half diameter holes drilled into solid rock – they had to blast in order to get a foundation in!

You do have many options, however blasting can be (I have found) quite affordable. Many years ago we built a horse stall barn near Benton City, Washington. This building had a total of 84 columns and was on a rock shelf. Powder monkey came out and blasted all of them for a couple of hundred dollar bills!

There are other choices – you can rent a “ram hoe” attachment for a skid steer or backhoe (this would probably be my pick). Read more here: https://www.hansenpolebuildings.com/2016/12/attacking-pole-barn-rocks-holes/

Or, a jackhammer – I would not suggest this option for more than just a hole or two.

 

DEAR POLE BARN GURU: I am in the planning stages for a pole barn build. The building will be 50 ft wide by 40 ft deep by 16 ft high at the eaves, posts spaced at 10 ft centers. This will go on a concrete pad and I am looking into using Sturdi-Wall Plus wet set brackets. My question is in regard to the height of the posts (roughly 16 ft) and the bending moment loads (wind loads) on the side of the building. Have you designed/installed posts with this height or higher before? If so, is there a place where I can point the planning officials to that shows the calcs and what not so they can make a decision as to whether or not this type of application with my situation will work or not?

I appreciate your help! MICHAEL in UPTON

DEAR MICHAEL: Thank you for reaching out to us. We have provided fully engineered post frame buildings using these very same brackets and eave heights of 24′. Your real solution is to have your building plans done by a Registered Professional Engineer who can provide verifying calculations for all components and connections.

 

DEAR POLE BARN GURU: I have a question about the structure of your pole barns. Do you use treated lumber or non treatmented lumber? I am asking about the post that go in the ground AND the boards that touch the metal roof. I worry about the wood rotting or bugs getting in it. KRISTEN in BAY MINETTE

DEAR KRISTEN: Any roof supporting structural columns are pressure preservative treated to UC-4B per International Building Code requirements. This is a greater level of pressure treatment than you can usually find at big box stores or local lumberyards. Any other lumber used in ground contact will be treated to UC-4A and tags will reflect ‘ground contact’. Lumber in contact with steel roofing (roof purlins) are not exposed to the weather, would not typically be pressure preservative treated. We do always recommend a condensation control be used between roof steel and roof framing. The easiest, from an application standpoint, would be a factory applied to roof steel Integral Condensation Control (DripStop or CondenStop). Other alternatives would be a Radiant Reflective Barrier (we can provide this in six foot width rolls with an adhesive pull strip attached for ease of joining rolls together) or to use two inches of closed cell spray foam.

 

Rock Letters

Hansen Pole Buildings’ Designer Doug recently sent this message to company owner Eric and me:

“I’m getting the question regarding rock letters from Clients and builders in central and eastern Oregon. 

Have we, or do we ever send the building department a rock letter regarding buildings where optimum post hole depth is not achievable?”

When I was building, a Volkswagon sized rock was generally parked and could be found in any given project’s last hole to be dug.

With all other holes dug – moving the building to avoid a rock just never felt like a viable option. I hated digging holes to begin with as they always entail dealing with unknowns, what is lurking beneath the ground’s surface. RMS Titanic’s Captain Edward Smith must have had some of these same feelings about icebergs, you never know what is below the surface until you hit it.

I used to take a steel stake used for anchoring concrete forms and a sledge hammer to investigate job sites prior to digging. Once building hole locations were laid out, said stake could be driven in at each hole location to determine if there were challenges ahead which could not be seen on the surface. At least by doing this stake test, we could determine with some degree of accuracy where challenges might lay, and if we thought we were going to have one, negotiate with our new building owner about shifting building location to avoid isolated rock.

My first choice for a solution would be to dig said rock out. Even if it leaves a crater numerous feet across, a sonotube can be placed at this column location, properly backfill around and column can be placed in the sonotube. This excavation is probably going to involve some heavier equipment, like a backhoe.

Behind door number two – rent a jackhammer. Unless you have hit solid granite, most rocks can be broken apart by use of a jackhammer and physical exertion to operate it.

Or a third choice (and often most practical) rent a “ram hoe” (aka concrete breaker) attachment for a skid loader or backhoe. This Hydraulic Breaker makes quick work out of a tough job. With a smart and efficient design it provides a workhorse with only two moving parts. Vibration and shock are controlled by shock absorbing polymers, minimizing machine wear and sound while improving operator comfort level. One can easily smash through concrete, even on an incline, with hardest hitting breakers in their respective impact energy classes. It has only two moving parts, one grease fitting. Also features low recoil and minimal hydraulic pressure spike, as well as unique trapezoidal shock wave for greater breaking power.

Eric’s response to Doug was, “When they can’t achieve designed depths required as shown on plans they would need an engineered fix.  No simple letter resolves the fact they could not get down to depths shown on plans. If they don’t go to use of wet set brackets a fix can be a variety of solutions depending on the rock’s size and depth. Previously our engineers have had clients who hit bedrock epoxy rebar into hole bottom bedrock to connect to concrete column encasement. Shale or other easily chipped rock doesn’t work for this solution, so it really depends on individual situations. In each case our engineer of record has to review circumstances, arrive at a design solution and client will incur costs to do so. “

This last option is not one to undertake on your own without an engineer’s involvement. You don’t want this to become a weak link resulting in failure of your beautiful brand new building.