Proper Ventilation, Condensation Control, and Post Treatment

This week the Pole Barn Guru answers reader questions about ventilation, how to control condensation on fifteen year old building, and best practices for treated posts in ground or on specialty brackets.

DEAR POLE BARN GURU: I have a barn that doesn’t have soffit vents but it does have a ridge vent. I installed reflective insulation which seems to have dropped the temperature quite a bit. I also have a gable powered fan that does 2000 CFM. However it is about 8 to 10 feet lower than the ridge vent. Are these two things fighting each other do you think or should I take a pipe and vent it up to my ridge vent and to my fan to take the hot air out from the top or should I turn my gable fan off completely.
I could always try to install some soffit vents as well. KEN in GREENVILLE

DEAR KEN: Your ridge vent is a natural air exhaust point, as warm air will rise and exit through it. Any vents lower in your building should be air intakes (whether gable or soffit vents) and ratio of net free ventilation area between the two should be roughly equal (intake can be up to 10% greater area than exhaust, but should not be greater).

 

DEAR POLE BARN GURU: I have a 30x56x10 Menards package with the inside finished off with drywall built 15 years ago. The roof was installed without any condensation control to the underside of the steel. The amount of condensation this past year created truss heave. All ceiling penetration’s are sealed and fiberglass blow in was installed to a r49 rating. what would be the most effective way to eliminate our condensation issue? Thank you for your time and knowledge. LOUIE in AMBOY

DEAR LOUIE: Drives me absolutely bonkers when providers or builders make no true efforts to advise customers on perils of condensation and how to prevent it. So easily, and inexpensively, done at time of construction.

Have two inches of closed cell spray foam applied to the underside of your roof steel. Make sure your dead attic space is adequately vented, ideally with soffit vents and ridge vent, or (if no sidewall overhangs) gable vents and ridge vent. If you do not have a vapor barrier under your concrete slab, apply a high quality sealer to it.

DEAR POLE BARN GURU: What are the pro’s and con’s for 6″x6″ posts to be set on a drilled whole with footer at the base then back filled VS drilled whole with footer poured to grade and using CBS/CBSQ column bases that are submerged into the footer while pouring so the 6″x6″ can be above grade.

Column bases are made by Simpson Strong-Tie on page 76 and 77 they also come in stainless steel. I attached the Simpson booklet for you to see the Column bases, I’m looking to build a 40’x40’x14′ pole barn with gable roof, one man door, 16′ wide x 13′ high insulated garage door, and a cement floor. I live in North East Ohio so I get a far amount of snow load.

Kind regards, DENNIS in CHESTERLAND

DEAR DENNIS: Properly pressure preservative treated columns, embedded in ground are unlikely to decay within lifetimes of anyone alive on our planet today https://www.hansenpolebuildings.com/2020/09/pressure-treated-post-frame-building-poles-rot/.

Simpson brackets you reference are not designed to withstand moment (bending) loads, just uplift and downward (gravity) loads. If your concern is properly pressure preservative treated columns will decay prematurely and do not want wood in ground, we can furnish your building kit package with Code compliant brackets and properly engineer concrete piers. Bracket mounting will increase your investment, somewhat, however if it results in your sleeping better at night, then they are well worth it.

 

Vapor Barrier for a Ceiling

Reader GEORGE in LOUISVILLE writes:

“I am looking to install tin on the ceiling of my 54 X 75 pole shed. I was wondering if 6 mil plastic sheeting with all seams taped would work for a vapor barrier? My concern is not to have it rain in my building after the tin is up and the heat is on.”

Mike the Pole Barn Guru:

Well George, this answer is not going to be nearly as simple as your question.

Prevention of internal rain (condensation) is going to be a function of several aspects.

#1 Controlling source – if there is not a well-sealed vapor barrier under your concrete slab on grade, you should be planning on two coats of a good sealant for it. If you do not know if there is a vapor barrier under it or not, leave a wrench on it overnight. Next day, pick the wrench up and if there is a dark place on the floor surface where the wrench was, you have no under slab vapor barrier.

#2 Source of heat – some heat sources add significant amounts of water vapor into your internal air (propane being a prime offender). Know what you are getting into before it becomes a challenge you do not want.

#3 How are you currently controlling condensation? If your building has a thermal break between purlins and steel roof – excellent. If not, your best solution is going to be two inches of closed cell spray foam applied to the underside of roof steel. This is not an inexpensive solution, but it is more practical than removing roofing, adding a thermal break, and reapplying roofing (plus roofing never goes back on as well as it was originally installed). Plan on $4000 to $4500 for closed cell spray foam.

vented-closure-strip#4 Ventilation – you are going to create a dead attic space above an insulated ceiling. If it is not adequately vented you are going to have problems. Best combination is vented eaves and ridge. Your building will require at least 1944 square inches of net free ventilation area (NFVA), distributed equally between eave and ridge. If this is not possible (building has no sidewall overhangs), then your choice is limited to gable vents and it will take many of them to provide adequate NFVA.

#5 You are in Climate Zone 5. This means a Class I or II vapor retarder is required for the interior side of framed walls. This could be 6 mil polyethylene (Visqueen) or Kraft-faced fiberglass batt insulation. For your ceiling a plastic vapor barrier should only be installed in vented attics in climates with more than 8,000 heating degree days. In Nebraska, heating degree days for a normal year is 6322.